« Continue Browsing

e-mail article Print     e-mail article E-mail

Published May 22 2013

Correction: Size incorrectly reported

A brief that appeared May 17 on Page A12 of The Forum about the growing demand for electricity in North Dakota’s Oil Patch erred in reporting the size of natural gas peaking plants being built by Basin Electric Power Cooperative. Each peaking station will have a capacity of 45 megawatts.